How the quote is calculated
Quote = (real total hours × hourly rate + direct costs) × (1 + risk buffer) ÷ (1 − platform fee − tax), rounded up to the next 10 (or 50 above 1,000).
Real total hours = production hours + communication time + revision rounds × hours per round. The walk-away floor uses your minimum hourly rate and no buffer.
Example
6 production hours at 80/hour, 20% communication, 2 revision rounds of 1 hour, 30 of direct costs, 15% buffer and no platform fee gives 9.2 real hours, a quote of 890 and a floor of 490 at a minimum rate of 50/hour. A client budget of 600 sits between the two: negotiate by cutting scope, not your rate.
FAQ
How do I include platform fees in my quote?
Divide what you want to keep by (1 − fee rate). With a 20% fee, keeping 400 means quoting 400 ÷ 0.8 = 500. The calculator grosses up fee and tax together.
What is a walk-away floor?
The lowest price that still pays your minimum hourly rate with no buffer. Below it you are working for less than you decided you are worth.
How much communication time should I add?
Include any time you expect to spend on briefs, emails, calls and feedback. If you have time logs from a similar project, use them to estimate the amount.
Should I charge a deposit?
A deposit can reduce the amount of work you do before receiving a payment. Agree with the client on the deposit and when the balance is due before you start.